CGWA NOC Application Form (Industrial/Infrastructure)




CGWA NOC Application Data Sheet

Industrial & Infrastructure Projects


Part 1: Applicant & Project Identification












Part 2: Location & Hydrogeology











Part 3: Water Requirement (m³/day)

Requirement Source Existing Abstraction Proposed Abstraction
3.1 Domestic/Drinking
3.2 Industrial Process
3.3 Cooling/Boiler
3.4 Greenbelt/Horticulture
A. Total Groundwater Requirement





0.00 m³/day
(Total A) – (Total B) – (Recycled Usage)

Part 4: Abstraction Structures

Type Status Year Depth (m) Pumping Hrs Discharge Flow Meter?

Piezometer Details



Part 5: Recharge Plan





Part 6: Fees & Compliance





Part 7: Attachments

7.1 Proof of Land Ownership/Lease Deed
7.2 SPCB Consent (CTE/CTO)
7.3 Water Balance Report & Flow Chart
7.4 Hydrogeological Report



7.7 Undertaking/Affidavit

Click “Draft with AI” to generate a custom undertaking text based on your form data.

CGWA Assistant

Hello! I’m your CGWA compliance assistant. Ask me anything about the form fields or regulations.