CGWA NOC 2025-26 Mandatory Compliance Guide
This comprehensive guide covers the NOC mandate, mandatory documents, abstraction charges, and key conditions for all entities drawing Groundwater for Commercial, Industrial, Mining, and Infrastructure Use.
Get Expert Assistance🏢 Understanding the CGWA NOC 2025-26 Mandate
The CGWA NOC (No Objection Certificate) is the official clearance required for commercial, industrial, mining, and infrastructure projects to legally draw groundwater. The mandate is strictly based on:
- The Volume of Groundwater Extraction (m³/day)
- The Area Classification (Safe, Semi-Critical, Critical, or Over-Exploited)
- The Submission of mandatory documents, impact assessment reports, and recharge plans.
Groundwater extraction without a valid NOC is illegal and attracts severe penalties under the Environment (Protection) Act, 1986.
🎯 Mandatory Compliance Checklist 2025-26
Water Harvesting System
Installation of Rainwater Harvesting (RWH) or Recharge System within the premises is mandatory for all users.
Digital Flow Meters
Install digital flow meters at all abstraction points and upload monthly readings to the online portal.
Biennial Water Audit
Mandatory submission of a Water Audit Report every two years for industrial units drawing more than 100 m³/day.
Piezometer Installation
Mandatory installation of dedicated monitoring wells (Piezometers) to regularly check groundwater levels.
Groundwater Quality Test
Submit groundwater quality data regularly from NABL-accredited laboratories.
Over-Exploited Area Rules
New commercial/industrial activities are strictly restricted in OE areas (except MSMEs and essential uses).
Commercial Use – CGWA Mandates
The CGWA does NOT grant NOCs for any new major commercial or industrial activity in Over-Exploited (OE) zones, except under special government directives.
Key Conditions
- Groundwater availability is verified before any sanction is granted.
- All commercial groundwater users must upload online Water Audit Reports.
- CGWA and SGWA (State Ground Water Authorities) conduct regular compliance verification through independent agencies.
Industrial Use – Conditions and Documents
In Over-Exploited areas, new industries (except MSMEs) are not granted NOC. However, extraction for drinking/domestic use and green belt development may be permitted.
Major Compliance Conditions
- NOC is permitted only if local water supply agencies cannot meet the demand.
- Industries must adopt water-efficient technologies and systems.
- Polluting industries must store harvested rainwater in surface tanks (no aquifer injection).
- Industries must pay water abstraction/restoration charges as per CGWA rates.
Essential Documents
- Affidavit regarding the non-availability of local water supply.
- Groundwater Quality Data from NABL-accredited labs.
- Copy of Consent to Establish / Environmental Clearance.
- Impact Assessment Report (if extraction >100 m³/day).
Mining Projects – Compliance Guide
All new and existing mining projects must obtain a CGWA NOC for groundwater abstraction. There are no blanket restrictions on mining in Over-Exploited areas, but strict compliance is essential.
Major Compliance Conditions
- Treated dewatering water must be reused for irrigation or dust suppression.
- Advanced dewatering technology must be used to avoid contamination.
- Mines must pay Abstraction Charges as per CGWA Tables 5.4A and 5.4B.
Essential Documents
- Approved Mining Plan.
- Rainwater Harvesting Plan or Recharge Proposal.
- Groundwater Impact and Socio-Economic Report by an accredited consultant.
Infrastructure Projects – Dewatering and Conditions
Projects like residential complexes, commercial hubs, and sports facilities must obtain a CGWA NOC before commencing work. In OE areas, dewatering is only permitted if no treated sewage water is available within 10 km.
Major Compliance Conditions
- Dewatering rate must be monitored with digital flow meters.
- STP (Sewage Treatment Plant) installation is mandatory if the requirement exceeds 20 m³/day.
- NOC validity will be linked to the construction period.
- Sports grounds and golf courses must have recharge systems.
Essential Documents
- Impact Assessment Report (with GW modeling in a 5 km radius).
- Confirmation of non-availability of treated sewage water within 10 km.
- Non-availability certificate from the local water supply agency.
- Details of water requirement as per National Building Code 2016.
💰 Government Fee & Abstraction Charges
| Type of Use | Safe Area (₹/m³) | Critical Area (₹/m³) | Over-Exploited Area (₹/m³) |
|---|---|---|---|
| Industrial | ₹1–₹10/m³ | ₹4–₹10/m³ | ₹6–₹20/m³ |
| Mining | ₹1–₹3/m³ | ₹3–₹6/m³ | ₹4–₹7/m³ |
| Infrastructure | ₹1–₹8/m³ | ₹4–₹10/m³ | ₹6–₹20/m³ |
Rates vary based on volume and location as per the official CGWA Tables (5.4A and 5.4B).
⚖️ Penalties for Non-Compliance
Failure to comply with **CGWA NOC** regulations can result in severe financial penalties and operational closure:
- Operating without CGWA NOC: ₹1 Lakh–₹5 Lakh Fine + disconnection of electricity/water supply.
- False reporting / Failure to submit Water Audit: ₹10,000 per day penalty.
- Failure to implement Rainwater Harvesting: NOC cancellation and prosecution.
❓ Frequently Asked Questions (FAQs)
1. Why is the CGWA NOC required?
It is necessary to ensure the regulated and sustainable use of groundwater, prevent over-extraction, and protect aquifers.
2. Who needs the CGWA NOC 2025-26?
All Commercial, Industrial, Mining, and Infrastructure projects that are drawing groundwater.
3. What is the Validity of the CGWA NOC?
The validity generally ranges from 3 to 5 years, depending on the project type.
4. Can MSME units get CGWA NOC in Over-Exploited areas?
Yes, but approval is usually restricted to domestic and green belt uses only.
5. How are the CGWA Charges paid?
All charges are paid through the Bharatkosh payment portal when submitting the online application.
🚀 Expert Assistance for CGWA NOC 2025-26 Compliance
For specialist help in preparing CGWA NOC documentation, compliance reports, and water audits — call 9279550247 or visit CGWAcompliance.com to ensure smooth approval and avoid costly penalties.
WhatsApp / Call:
9279550247Website:
CGWAcompliance.com