Apply for CGWA NOC 2025-26 – Complete Guide for Industries

Apply for CGWA NOC 2025-26 – Complete Guide for Industries

If you’re planning to Apply for CGWA NOC 2025-26 for your industrial or commercial setup, this guide covers the process, documents required, and fees. Get smooth CGWA approval whether your groundwater withdrawal is below 10 KLD or above 100 KLD.

Get Expert Help Now

🌐 Understanding the CGWA NOC Mandate

The Central Ground Water Authority (CGWA) regulates the extraction of groundwater across India. Any industry, infrastructure, or mining project drawing groundwater must obtain a NOC (No Objection Certificate) from CGWA before starting operations. This certification ensures sustainable use of groundwater resources and prevents over-exploitation in critical or over-exploited (OE) areas, making compliance mandatory for 2025-26 operations.

CGWA NOC 2025-26 – Withdrawal Less than 10 KLD

Industries withdrawing less than 10 KLD (Kilolitres per day) of groundwater can apply under a simplified procedure. This applies primarily to smaller commercial or service units.

Documents Required

  • Consent to Establish from State Pollution Control Board or MoEF/SEIAA.
  • Affidavit on β‚Ή10/- stamp paper confirming non-availability of public water supply.
  • Affidavit for Drinking/Domestic/Green Belt usage (Required in OE areas only).
  • Approval from Wetland Authority (if applicable).
  • Bharatkosh receipt of application fee.
  • Ground Water Quality Report.

Government Fee

Application Fee: β‚Ή10,000

Payable via Bharatkosh under “Central Ground Water Board” (CGWB).

Apply Now

CGWA NOC 2025-26 – Withdrawal 10 to 100 KLD

If your plant requires 10–100 KLD, the documentation and scrutiny are more detailed, often involving hydrogeological data. This applies to most medium-sized industries.

Documents Required

  • Consent to Establish or equivalent letter from statutory body.
  • Certificate of non/partial availability of water from local government supply agency.
  • Groundwater Quality Report from NABL approved lab.
  • MSME Certificate (for eligible units).
  • Wetland Authority approval (if applicable).
  • Source Water Availability Certificate.

Government Fee

Fee Range: β‚Ή25,000 – β‚Ή50,000

The fee varies based on usage and zone type (Safe, Semi-critical, Critical, or OE).

Apply Now

CGWA NOC 2025-26 – Withdrawal Above 100 KLD

Large industries extracting more than 100 KLD must submit detailed hydrogeological and Environmental Impact Assessment reports. This requires specialized technical documentation.

Documents Required

  • Consent to Establish or equivalent letter from statutory body.
  • Certificate of non/partial water availability from local agency.
  • Groundwater Quality Report from NABL approved lab.
  • Impact Assessment Report with GW Modelling (Mandatory for this category).
  • Wetland Authority approval.
  • Bharatkosh payment receipt.

Government Fee

Fee Range: β‚Ή1,00,000 – β‚Ή2,00,000

Depends on category, area type (OCS/Hard Rock/Soft Rock zone), and final assessment.

Apply Now

Penalty for Not Applying for CGWA NOC

Industries extracting groundwater without a valid NOC risk serious legal action:

  • Penalty up to β‚Ή2 Lakh, depending on the severity of the violation.
  • Closure Notice issued by the State Pollution Control Board.
  • Additional environmental compensation charges for each day of violation.

Regular compliance ensures uninterrupted business operations and eligibility for NOC renewal.

❓ Frequently Asked Questions (FAQs)

1. Why is CGWA NOC mandatory for 2025-26?

It is mandatory to ensure groundwater is used sustainably and industries operate within legal and environmental limits, protecting water resources for the future.

2. What is the validity period of CGWA NOC?

Generally valid for 3 years, after which a renewal application must be submitted before the expiry date to maintain compliance.

3. How long does it take to get CGWA approval?

Approval typically takes 45–60 days, depending on the completeness of documents and the local authority review process.

4. Is CGWA NOC applicable for borewell or tubewell?

Yes. Any groundwater abstraction structure (borewell/tubewell) used for industrial or commercial purpose requires a valid NOC.