Apply for CGWA NOC 2025-26 β Complete Guide for Industries
If youβre planning to Apply for CGWA NOC 2025-26 for your industrial or commercial setup, this guide covers the process, documents required, and fees. Get smooth CGWA approval whether your groundwater withdrawal is below 10 KLD or above 100 KLD.
Get Expert Help Nowπ Understanding the CGWA NOC Mandate
The Central Ground Water Authority (CGWA) regulates the extraction of groundwater across India. Any industry, infrastructure, or mining project drawing groundwater must obtain a NOC (No Objection Certificate) from CGWA before starting operations. This certification ensures sustainable use of groundwater resources and prevents over-exploitation in critical or over-exploited (OE) areas, making compliance mandatory for 2025-26 operations.
CGWA NOC 2025-26 β Withdrawal Less than 10 KLD
Industries withdrawing less than 10 KLD (Kilolitres per day) of groundwater can apply under a simplified procedure. This applies primarily to smaller commercial or service units.
Documents Required
- Consent to Establish from State Pollution Control Board or MoEF/SEIAA.
- Affidavit on βΉ10/- stamp paper confirming non-availability of public water supply.
- Affidavit for Drinking/Domestic/Green Belt usage (Required in OE areas only).
- Approval from Wetland Authority (if applicable).
- Bharatkosh receipt of application fee.
- Ground Water Quality Report.
Government Fee
Application Fee: βΉ10,000
Payable via Bharatkosh under “Central Ground Water Board” (CGWB).
Apply NowCGWA NOC 2025-26 β Withdrawal 10 to 100 KLD
If your plant requires 10β100 KLD, the documentation and scrutiny are more detailed, often involving hydrogeological data. This applies to most medium-sized industries.
Documents Required
- Consent to Establish or equivalent letter from statutory body.
- Certificate of non/partial availability of water from local government supply agency.
- Groundwater Quality Report from NABL approved lab.
- MSME Certificate (for eligible units).
- Wetland Authority approval (if applicable).
- Source Water Availability Certificate.
Government Fee
Fee Range: βΉ25,000 β βΉ50,000
The fee varies based on usage and zone type (Safe, Semi-critical, Critical, or OE).
Apply NowCGWA NOC 2025-26 β Withdrawal Above 100 KLD
Large industries extracting more than 100 KLD must submit detailed hydrogeological and Environmental Impact Assessment reports. This requires specialized technical documentation.
Documents Required
- Consent to Establish or equivalent letter from statutory body.
- Certificate of non/partial water availability from local agency.
- Groundwater Quality Report from NABL approved lab.
- Impact Assessment Report with GW Modelling (Mandatory for this category).
- Wetland Authority approval.
- Bharatkosh payment receipt.
Government Fee
Fee Range: βΉ1,00,000 β βΉ2,00,000
Depends on category, area type (OCS/Hard Rock/Soft Rock zone), and final assessment.
Apply NowPenalty for Not Applying for CGWA NOC
Industries extracting groundwater without a valid NOC risk serious legal action:
- Penalty up to βΉ2 Lakh, depending on the severity of the violation.
- Closure Notice issued by the State Pollution Control Board.
- Additional environmental compensation charges for each day of violation.
Regular compliance ensures uninterrupted business operations and eligibility for NOC renewal.
π Important Links β Your Next Steps
β Frequently Asked Questions (FAQs)
1. Why is CGWA NOC mandatory for 2025-26?
It is mandatory to ensure groundwater is used sustainably and industries operate within legal and environmental limits, protecting water resources for the future.
2. What is the validity period of CGWA NOC?
Generally valid for 3 years, after which a renewal application must be submitted before the expiry date to maintain compliance.
3. How long does it take to get CGWA approval?
Approval typically takes 45β60 days, depending on the completeness of documents and the local authority review process.
4. Is CGWA NOC applicable for borewell or tubewell?
Yes. Any groundwater abstraction structure (borewell/tubewell) used for industrial or commercial purpose requires a valid NOC.
π Expert Help for CGWA NOC 2025-26
CGWA Compliance Experts provides end-to-end assistance to Apply for CGWA NOC 2025-26, prepare technical reports, and handle online submissions through the Bhuneer portal.
WhatsApp / Call:
9279550247Website:
CGWAcompliance.com