Self Inspection Process in BhuNeer Portal
Step-by-Step Guide for Self Inspection
Self Inspection in the BhuNeer portal is a mandatory step for CGWA NOC renewal, where applicants must verify groundwater usage, enter flow meter readings, abstraction structure, telemetry, water quality, and monitoring well data, and upload required documents. Once submitted, a success message confirms compliance for renewal.Here is the Step By Step Process of Self Inspection on Bhuneer Portal
Verify Data
Begin the self-inspection process by verifying the details already available in the system. Ensure all fields are filled correctly before proceeding.
Steps:
1.Check and verify the pre-filled data.
2.Enter the Date of Inspection.
3.Click on Save and Next to continue.

Water Flow Meter Details
In this section, you must provide details of your water flow meter, including specifications and readings.
Steps:
1.Fill in all required fields for the flow meter.
2.Click on Add to List to save the entry.
3.Use Save in Draft if you want to edit later.
4.Click Save and Next to move forward.

Groundwater Abstraction Structure
Here, you need to enter details about your borewell or tubewell structure used for groundwater abstraction.
1.Fill all fields related to the abstraction structure.
2.Click on Add to List to save the details.
3.Click Save and Next to proceed.

Telemetry Details
Telemetry refers to automated devices used for monitoring groundwater data. Enter telemetry information, if applicable, in this section.
Steps:
1.Provide details of the telemetry device installed.
2.Click Save and Next to move to the following tab.

Water Level Monitoring Well
Here, you must enter information about piezometers or monitoring wells that record groundwater levels.
Steps to Submit Response
①Click on Add Piezometer to input details.
②Enter all required fields such as location, depth, and readings.
③Click Save and Next to proceed.

Water Quality Report
This tab is used to upload and record results from laboratory water quality tests.
1.Fill in all required fields related to the water quality report
2.Upload supporting documents if required.
3.Click Save and Next to continue.

Other Report
Any additional reports required for compliance must be uploaded in this section.
1.Enter relevant details in the “Other Report” tab.
2.Attach documents if applicable.
3.Click Save and Next to move ahead.

Penalties & Final Submission
The last step of self inspection involves reviewing penalties and final submission of the form. Applicants may also opt for rebate on charges at this stage.
1.Check the box if you are applying for Rebate on Ground Water Abstraction Charges (optional).
2.Review the penalties applicable.
3.Click Final Submit to complete the self inspection.
4.A success message will appear confirming submission.
5.A new Application Code and Application Number will be generated for future reference.


FAQs on CGWA Self Inspection in BhuNeer Portal
Q1. What is Self Inspection in the BhuNeer portal?
Ans : Self Inspection is a mandatory process under CGWA where applicants verify their groundwater usage, update details such as flow meter, abstraction structures, telemetry, monitoring wells, and upload required reports before NOC renewal.
Q2. Where do I find the Self Inspection option?
Ans : After logging into the BhuNeer portal, go to your application dashboard and select the Self Inspection tab linked to your NOC renewal application.
Q3. What details do I need to provide in Self Inspection?
Ans : You must fill in data across multiple tabs:
- Water Flow Meter Details
- Groundwater Abstraction Structures
- Telemetry (if installed)
- Water Level Monitoring Wells (piezometers)
- Water Quality Report
- Other Reports (if applicable)
Q4. Do I need to upload documents during Self Inspection?
Ans : Yes. You must upload your CGWA NOC certificate, compliance reports, water quality test reports, calibration certificates of flow meters, and geo-tagged photographs where applicable.
Q5. Can I save my self inspection progress and complete it later?
Ans : Yes. Each tab has the option Save in Draft so you can save your work and complete the inspection later before final submission.
Q6. What happens after completing all tabs in Self Inspection?
Ans : Once all sections are filled and documents uploaded, you must click Final Submit under the Penalties section. A success message will appear, and you will receive a new Application Code and Application Number.
Q7. Is it mandatory to enter telemetry details?
Ans : If you have a telemetry device installed, you must provide its details. If not, you can proceed without filling this tab.
Q8. Can I apply for rebate during Self Inspection?
Ans : Yes. In the Penalties & Final Submission tab, you can check the rebate option for groundwater abstraction charges, if applicable.
Q9. What if I make a mistake after submission?
Ans : Once you submit the self inspection and a new application number is generated, no changes can be made. Always double-check your entries before clicking Final Submit.
Q10. Why is Self Inspection important for renewal?
Ans :Self Inspection ensures that applicants are following CGWA norms, maintaining groundwater monitoring, and providing accurate data. Without completing this process, your NOC renewal cannot proceed.